Numatic Building 32

Discipline: Structural
Sector: Industrial

The project involves the design of what has been designated by Numatic as Building 32. It comprises of a three (3) phase project to construct a manufacturing and distribution centre for ‘Henry’ vacuums. The building consists of a new mould shop, goods in / intermediate storage area, assembly area and distribution centre.

The design of the building is to be a steel frame superstructure with a pile substructure. The walls are a combination of brick masonry walls constructed from piled ground beams and cladding with side rails. The ground floor is a pile-reinforced concrete slab, with the piles tying into the concrete slab. Phase 1 is currently in construction while Phase 2 is scheduled for 2025. We are eager to share the development of this project as we progress.

Related Projects